Hugdrigo collection / Project 113
Simulation workspace
● Manufacturing planning intelligence

Material clarity.
Production confidence.

See what's needed, when to release orders, and which components could delay your plan. A transparent, multi-level material requirements planning laboratory.

◉ 8-week horizon · synthetic data

Demand vs planned receipts

Aggregated units across finished goods · weeks 1 to 8

MRP
Gross demandPlanned receipts

Procurement concentration

Top material costs · bars relative to largest cost

Priority action queue

Releases that need an earlier start or immediate attention

Planning signals

What this scenario means

◈ Material requirements planning

Build the production plan.

A time-phased bill-of-materials explosion. Planned receipts meet gross requirements, while release dates incorporate lead times.

Plan configuration

Changes recalculate requirements across all levels of the bill of materials

Time-phased requirements

Choose a material to inspect gross demand, on-hand stock and replenishment orders

Complete material plan

All quantities are simulated; receipts are assumed available on time

▤ Editable bill of materials

Understand every component.

Maintain a multi-level component tree, opening inventories, lead times and unit costs. Changes immediately affect the complete plan.

Material master

Editing is local to this browser · archived items are preserved in your backup

Bill-of-materials relationships

Each parent consumes component quantities when its planned production is released

◉ Supply and demand stress test

Test before you commit.

Compare baseline material purchases, release risks and projected inventory with alternative planning assumptions.

Scenario comparison

Changes calculated using the same opening inventory and bill of materials

Demand by finished product

Master production schedule · editable weekly forecast

Interpretation

Limits and decision considerations

≡ Reproducible planning assumptions

Transparent by design.

Understand how this studio calculates its material plan, where assumptions enter and what the model does not prove.

Planning algorithm

1. Topological BOM order. Finished assemblies are processed before their subassemblies and raw materials. A cyclic component relationship is rejected.

2. Gross requirements. Finished goods start with the editable master demand schedule. Child demand is triggered by their parents' planned order releases, multiplied by the bill-of-materials quantity.

3. Inventory netting. At each week, available inventory is deducted from gross need. An order receipt is planned when needed to cover requirements plus the safety stock target.

4. Planned releases. Every receipt is shifted earlier by the material's lead time. Releases prior to week 1 are flagged as pre-horizon and the corresponding children are assumed to require material at the planning boundary.

5. Cost estimate. Planned order receipts multiplied by synthetic per-unit costs, without taxes, freight, MOQ, yields or contract restrictions.

Important limitations

Not connected to ERP. The demo does not see stock, purchase orders, suppliers or factories in real time.

Not an advanced production scheduler. Labor, work-center capacity, waste, variable yields, setup times, calendar holidays and transportation are excluded.

Timing risk is a signal. A pre-horizon release indicates potential infeasibility; it is not a calibrated probability of a late delivery.

Inventory assumption. All planned receipts are presumed on time. There are no unmodeled outstanding orders or backorders.

Privacy. Everything runs locally in this browser. Import only information you are comfortable storing on this device; backups are plain JSON.

Reproducibility. All demo inputs and calculation rules are inspectable in this single HTML file. No API key, login or remote service is required.

Hugdrigo / Project 113
Open-source educational manufacturing simulator · MIT